References

Examples from some of our previous projects

CEB
CEB
ITALY (2007)
Finn-Power, SHEAR GENIUS-punching and shearing system installation.
Keljonlahden voimalaitos
Jyväskylän Energia
Keljonlahti power plant,
Jyväskylä FINLAND (2009)
Raumaster, external solid fuel handling system installation.
Nivalan Kaukolämpö
Nivalan Kaukolämpö Oy
Nivala FINLAND (2010)
BMH Technology, external/internal solid fuel and ash handling system commissioning.
EMPB
EMPB/Fortum
Częstochowa POLAND (2010)
BMH Technology, external solid fuel handling system commissioning.
Lahti Energia KYVO2
Lahti Energia
Lahti Energia, KYVO2,
Lahti FINLAND (2011)
BMH Technology, external solid fuel handling system installation.
KVV Karlskrona
KVV Karlskrona
Karlskrona SWEDEN (2011)
BMH Technology, external solid fuel handling system installation.
Oulun Energia Toppilan voimalaitos
Oulun Energia
Toppila power plant,
Oulu FINLAND (2012)
BMH Technology, external solid fuel handling system installation.
Helen Salmisaaren pellettimuutos
Helsingin Energia
Helsinki FINLAND (2014)
Installation of pellet processing system.
Nokian virran Energia
Nokian virran Energia
Nokia FINALND (2015)
Installation of solid fuel reception and processing system.
HorsePower-linja
Fortum Järvenpää
Järvenpää FINLAND (2016)
Installation of the HorsePower line.
Helen Salmisaaren pellettimuutos
Sca Nokia
Nokia FINLAND (2017)
Sludge transportation system from the dewatering press to the Nokianvirta power plant.
Vantaan Energia Marbio
Vantaan energia
Vantaa FINLAND (2018)
Vantaa Energy, Martinlaakso power plant: installation and commissioning of solid fuel processing system for the Marbio project.
BMH Technology Naistenlahti 3

Tampere FINLAND (2021)
Naistenlahti 3 installation site